Steel and Concrete
This be an apartment building in progress. When finished it will have 6 stories plus a first
floor garage...it was the construction method that interested me. No wood here.
The trucks that carry those concrete slabs are rated at 36 tons, they carry up to 8 slabs which
are used as flooring and walls and are hauled in from Canada to SE Michigan.
I can only assume that we don't mold them in MI. That looks like one big crane for a small job.
The thing that is disappointing is the leisurely rate of construction...your looking at 6 months.

-
30th September 2015, 08:31 PM
#2
Re: Steel and Concrete
Interesting observation here...maybe longer than 6 months perhaps??